Product Image

Machine tools

Full-line integration and quality assurance

Automation and transfer systems

Purchase options

Contact us

Full-line integration and quality assurance

We conduct full‑line trial run, process optimization and quality verification in Komatsu NTC’s large integrated test facility. The entire system can operate as a fully integrated continuous line without splitting the process. Machining quality and overall performance are verified in advance to ensure stable and reliable startup at installation.


    Specifications

    Metric Imperial (US)
    Expand all

    • Process setup and verification: Trial run, accuracy check, process capability assurance, continuous operation testing, first good part confirmation, master part verification, and more.