Engineered for outstanding digging power and faster cycle times, the 2800XPC electric mining shovel is intended to be the productive, reliable, low cost per tonne workhorse of your fleet. Featuring an AC electrical system designed to move materials quickly, the 2800XPC is built to give you years of dependable service even in tough environments.
Height of cut | 16.6 m |
Radius of cut | 24.2 m |
Dumping height* (door open) | 9.1 m |
Floor level radius | 16.4 m |
Tail swing radius | 9.9 m |
Operator eye level | 9.6 m |
Height of cut | 54 ft. 6 in |
Radius of cut | 79 ft. 3 in |
Dumping height* (door open) | 30 ft. 0 in |
Floor level radius | 53 ft. 9 in |
Tail swing radius | 32 ft. 6 in |
Operator eye level | 31 ft. 4 in |
Nominal payload* | 59.0 mt |
Nominal dipper capacity |
26.8 - 33.6 m3 |
Rated suspension load | 122.5 mt |
Optimum truck size (218 mt (240 st) truck shown) |
172 - 240 mt |
Nominal payload* | 65.0 st |
Nominal dipper capacity |
35.0 - 44.0 yd3 |
Rated suspension load | 135.0 st |
Optimum truck size (218 mt (240 st) truck shown) |
190 - 265 st |
Supply voltage* | 4,160 or 7,200 V 3 phase, 60 Hz |
5,000, 6,000 or 6,600 3 phase, 50 Hz |
Supply transformer | (minimum) 2,750 kVA | |
Minimum short circuit VA available at shovel | 22 MVA |
Supply voltage* | 4,160 or 7,200 V 3 phase, 60 Hz |
5,000, 6,000 or 6,600 3 phase, 50 Hz |
Supply transformer | (minimum) 2,750 kVA | |
Minimum short circuit VA available at shovel | 22 MVA |
Propel on demand provides rapid transfer to propel mode. Rapid transfers allow frequent positioning of the shovel to the bank resulting in faster cycle times and more efficient digging.
Two rugged P&H planetary gear cases of proven design independently transmit torque to the drive sprockets, producing the tractive effort required for fast, efficient propel and positioning operations.
Delta drive low tension sprocket drive system with heavy duty cast crawler shoes.
Spring-set air release disc brakes – one per motor.
Propel on demand provides rapid transfer to propel mode. Rapid transfers allow frequent positioning of the shovel to the bank resulting in faster cycle times and more efficient digging.
Two rugged P&H planetary gear cases of proven design independently transmit torque to the drive sprockets, producing the tractive effort required for fast, efficient propel and positioning operations.
Delta drive low tension sprocket drive system with heavy duty cast crawler shoes.
Spring-set air release disc brakes – one per motor.
Powerband V-belt drive between motor and gear case absorbs shock loads.
First and second reduction gearing in enclosed gear case for reliable splash lubrication, ease of maintenance, and extended component life.
Twin-leg dipper handle with torsion box and rack and pinion drive has inherent stability in the bank for optimal digging.
Spring-set air release disc brake.
Powerband V-belt drive between motor and gear case absorbs shock loads.
First and second reduction gearing in enclosed gear case for reliable splash lubrication, ease of maintenance, and extended component life.
Twin-leg dipper handle with torsion box and rack and pinion drive has inherent stability in the bank for optimal digging.
Spring-set air release disc brake.
Two modular P&H planetary gear cases of proven design and a single piece forged swing gear transmit torque for fast cycle times.
Spring-set air release disc brakes – one per motor.
Splash lube filtration system.
Two modular P&H planetary gear cases of proven design and a single piece forged swing gear transmit torque for fast cycle times.
Spring-set air release disc brakes – one per motor.
Splash lube filtration system.
All gearing housed in single enclosed gear case with filtered and cooled oil fed to all bearings in addition to splash lubrication for reliable operation and ease of maintenance.
Large 142.24 cm diameter hoist drum for extended rope bending life. Ferrule becket system and dual electric tuggers are standard for efficient rope change.
Spring-set air release disc brakes – one per motor.
All gearing housed in single enclosed gear case with filtered and cooled oil fed to all bearings in addition to splash lubrication for reliable operation and ease of maintenance.
Large 56 in diameter hoist drum for extended rope bending life. Ferrule becket system and dual electric tuggers are standard for efficient rope change.
Spring-set air release disc brakes – one per motor.